Bahrain: The Ministry of works UPDA completed 56% of the main rainwater drainage line construction, which connect to housing projects in Al Aker area. Eng. Saleh Tradah mentioned that the project aims to mitigate rainwater accumulated in that area which is also a joint effort between the Ministry of Works and Capital to develop the infrastructure in the Capital Governorate and rehabilitate the most affected areas during the rainy season.
Trending
- Thousands of Australians without power after tropical cyclone hits Queensland
- Gulf Air eases January travel with enhanced baggage options
- BIC to host official draw, autograph session ahead of 2026 Bahrain Darts
- Capital Governor receives German Ambassador
- HRH the Crown Prince and Prime Minister commends HM the King’s designation of 2026 as the “Year of Isa Al Kabeer”
- 350,000 hectares burned, more than 300 structures destroyed by Australian bushfires
- Interior Ministry launches overseas passport replacement service via national eGovernment portal
- Australia wildfires burn more than 300,000 hectares in Victoria

